Jump to content
  • Main menu settings

    1. 1

      General information

      When running the program, firstly you see main menu. Here you can: Point the links with the anchor text or without it, for profiles and comments. Specify the articles for blogs and forums. Check the data correctness. Save the settings in a separate project for future use. Upload an existing project. Save the settings in a separate project for future use.  Create the projects queue (actual for the standard version, for the premium version, we recommend to use a special utility "Project manager»). Track implementation process run. Observe the results, interacting with indicators. In the 1st chapter "Quick Start", we have already discussed the format of the posted links, we’ll not duplicate that information and we’d better tell you about those moments that are missed.
    2. 2

      Functions and features

      Navigation: Count links Insert link Preview Check the correctness links Add video or image When adding the links or article, you can take advantage of special options. Count links     Check the number of links and texts/articles mentioned. Insert link Insert the HTML/BBCODE link in the supported by the program format. Preview    Preview, you can see how the information will look like. Check the correctness links Check the correctness of the data entered, the button "Verify". Using this option you can see if you make a mistake somewhere in the input data.     If there are errors, you will receive a notification with a warning and information about the problem. If these are texts and links, in each line there must be a link in the supported by the program format, in case of an error in the link itself, there will be a warning that the link is not found. As for articles, the link should be in every single article, if the link is absent, there will be specified the article number where is the problem. Note If an error occurs, the program can’t be run, because error in the project will lead to incorrect program operation. For example, the program determines the post success by the presence of an active links on the page and if it does not exist, the successful post will not be counted and the website will fall into unsuccessful, even if everything was correct and the post was completed. That’s why it is important to specify data in the supported format When starting execution, the program further checks the entered data. Similar options are available in the articles settings. Add video and image In "articles settings" available two options:  Insert a picture or video in the article.
    3. 3

      Work with projects

      Navigation: Create project Queue With the help of the projects, you can always have access to your data. You do not need every time to enter the same data, storing them in dozens of test documents. You can save all settings within a single project Each project saves the settings individually: Links with the anchor text or without it. Articles, titles, tags. Base settings Fill settings. With the help of projects you can create a queue for execution. For example you need to run 10 websites, you can configure the program for each website and save settings on individual projects. Then, create a queue of all the projects and start their implementation, you can create tasks for the month ahead and forget about the program, do something different, and Xneolinks will be working all the time instead of you, carrying out all the tasks. Create project To save the project, you need to fill key data, go to the main menu, enter the project name and click on "Save". For downloading a saved project, you need to select it from the list and click on the button: «Load project». If you want edit the project - download it, make changes and save it with the same name, agreeing with the data change. What is the way to create the projects queue in the standard program version? Select alternately the projects from the list and click on "Add to queue" button. Be sure to enable the sequence in the screenshot above, the option is called "Enable", when enabling, it is replaced with «Disable». You can remove project from the queue by selecting the desired one from the list and clicking on the "Remove from queue" button. Queue In the premium version you can use the special utility "Task manager". You can open the utility by clicking on the special icon highlighted in the screenshot above. Select a project from the list, you can select several projects at once. When having chosen, click on the "Add task" button. Projects will be displayed in the list. You can edit the start time of each project. In this case, the projects will be executed sequentially. The program focuses on the most minimal date, if one of the projects was performed longer than planned, the project whose scheduled time has passed will be executed next, regardless of the situation. In the project start time settings, you can’t specify the past date. You can pass to the "Project Settings" tab and in a convenient window, create tasks without using projects. Create an intermediate project which will not be saved after execution. For projects sequence work, you need to enable the option.
 The buttons which are responsible for the program operation:
    4. 4

      Start, pause, stop

      The execution starts from the main menu. There are 4 buttons in front of you: Start linking. Pause. The program is paused not immediately, but only when the running threads are completed. You can put the program to a pause at any execution stage. To deactivate the pause, click on the "Run" button. Stop linking. When using this button, you stop the program and clear all data. Do not forget to generate a report in advance, if it is necessary, because when stopping the program, you delete all the data and you will not be able to restore it. Generate report. When clicking, an intermediate report will be generated. It is possible to generate an interim report during the runtime.
    5. 5

      Indicators

      Navigation: Successful links indicator Queue execution indicator Mail indicator Failed resources indicator Tips in indicators During the runtime, you do not need to generate an interim report, you can monitor the process in real- time by indicators.  There are 4 indicators types. All indicators are clickable and contain advanced implementation information. Successful links indicator Resources are displayed at the places where the placement was successful. Remind, that placement is considered successful, where the posted link was found. Queue execution indicator There is the information on the resources to be performed at the next stage. At the first stage, the indicator displays information on successfully detected cms. At the second stage there is the information on the resources waiting for the letter with the data to be activated. Mail indicator Available at the third stage and replaces the queue indicator. This indicator displays the information on the execution status of resources which require data to be activated from mail. If the data is absent, this indicator will display the information on failed resources where mail has not arrived. Failed resources indicator Tips in indicators You can move the mouse cursor over the indicator and get extended information. There is displayed the information on resources in which the placement was failed. For convenience, all errors are grouped by type.
    Sign in to follow this  
×
×
  • Create New...