With the help of the projects, you can always have access to your data. You do not need every time to enter the same data, storing them in dozens of test documents. You can save all settings within a single project
Each project saves the settings individually:
- Links with the anchor text or without it.
- Articles, titles, tags.
- Base settings
- Fill settings.
With the help of projects you can create a queue for execution. For example you need to run 10 websites, you can configure the program for each website and save settings on individual projects. Then, create a queue of all the projects and start their implementation, you can create tasks for the month ahead and forget about the program, do something different, and Xneolinks will be working all the time instead of you, carrying out all the tasks.
Create project
To save the project, you need to fill key data, go to the main menu, enter the project name and click on "Save".
For downloading a saved project, you need to select it from the list and click on the button: «Load project». If you want edit the project - download it, make changes and save it with the same name, agreeing with the data change.
What is the way to create the projects queue in the standard program version?
Select alternately the projects from the list and click on "Add to queue" button. Be sure to enable the sequence in the screenshot above, the option is called "Enable", when enabling, it is replaced with «Disable».
You can remove project from the queue by selecting the desired one from the list and clicking on the "Remove from queue" button.
Queue
In the premium version you can use the special utility "Task manager". You can open the utility by clicking on the special icon highlighted in the screenshot above.
Select a project from the list, you can select several projects at once. When having chosen, click on the "Add task" button.
Projects will be displayed in the list. You can edit the start time of each project. In this case, the projects will be executed sequentially. The program focuses on the most minimal date, if one of the projects was performed longer than planned, the project whose scheduled time has passed will be executed next, regardless of the situation.
In the project start time settings, you can’t specify the past date.
You can pass to the "Project Settings" tab and in a convenient window, create tasks without using projects. Create an intermediate project which will not be saved after execution.
For projects sequence work, you need to enable the option.
The buttons which are responsible for the program operation: